Mobirise

With over 16
Years Of Experience

Tectoni Africa LTD is a beacon of excellence in the world of GeoScience. With a legacy spanning over two decades, the company has consistently upheld a reputation for delivering projects of exceptional quality and innovation.

Unwavering dedication to pushing the boundaries of geo-engineering practices.

Mobirise Website Builder

GEOTECHNICAL INVESTIGATIONS  BY

DYNAMIC PROBING LIGHT (DPL) FOR A
PILOT MANAGED AQUIFER FOR MT. ELGON TRANSBOUNDARY

Services involved:
  • Tectoni Africa Ltd was subcontracted by NOVELTY CONSULT AND ENGINEERING LTD to conduct Geotechnical Investigations for the Design and Construction of an Elevated Tank for a pilot managed aquifer for Mt. Elgon transboundary located nearby Bwikhonge police station close to the Trading Centre in Bulambuli District.
Mobirise Website Builder

GEOTECHNICAL INVESTIGATIONS

DRILLING AT OLUKO PROPOSED QUARRY

Services involved:
  • Tectoni Africa Ltd was subcontracted by Fitchner to conduct Geotechnical Investigations and carry out alkali reactivity tests for the proposed Quarry sites that will be used during the construction of the R.Enyau Dam. Under our Subcontractor scope for the Feasibilty studies for R.Enyau Dam in Arua.
Mobirise Website Builder

FEASIBILTY STUDIES FOR

R.ENYAU WATER DAM in Arua City

Services involved:
  • Tectoni Africa Ltd was engaged as a subcontractor by Fichtner GmbH & Co. KG to conduct comprehensive geotechnical and geophysical investigations for the Arua Water Dam Feasibility Study, a critical component of the Climate Resilience and Water Infrastructure for Refugees and Host Communities in Northern Uganda Program.
Mobirise Website Builder

Geotechnical Investigations for the 

Proposed Port Bukasa

Services involved:
  • The TCA-BUKASA-2024 Project is a landmark initiative led by Tectoni Africa, focusing on the geotechnical investigations and foundational studies for the proposed Kampala Port at Bukasa. Our team conducted extensive geotechnical investigations, including drilling 100 meters beneath water, to assess soil stability and suitability for large-scale infrastructure.
Mobirise Website Builder

183MW ISIMBA HYDROPOWER PROJECT AND
 THE ISIMBA –BUJAGALI INTERCONNECTION PROJECT 

RAMS – For Correcting inconsistent C3 inclinometer readings 

Services involved:

  • Tectoni Africa completed borehole drilling at the dam site to address inconsistent C3 inclinometer readings, following ISI-MS-144 RAMS. A 30x30 cm section of asphalt concrete, gravel, water-stable layer, and filter material was removed to access the clay core, with materials stored for backfilling. Using SP3500 DESCO geological drill rig on a plastic sheet to prevent contamination, a 110 mm diameter borehole was drilled to 21.2 m, with casing advanced to minimize clay core disturbance. No water or high-pressure air was used, and drilling maintained a consistent speed. 
Mobirise Website Builder

MINERAL EXPLORATION - 2000m

Limestone exploration in the Queen Elizabeth National Park Reserve

Services involved:
  • We undertook a groundbreaking 2000-meter exploration of limestone rock in Queen Elizabeth Park, Kasese, contributing valuable geological data for future resource development.
Mobirise Website Builder

Advanced Grouting

Grouting works at Nile Breweries

Services involved:
  • Tectoni Africa successfully completed advanced grouting works at Nile Breweries, ensuring structural integrity and enhanced operational efficiency for one of the region's leading breweries.
Mobirise Website Builder

BURUNDI

Foundation, Tower Erection & Stringing - Jijji & Mulembwe Burundi

Services involved:

  • Tectoni Africa successfully completed the erection, concreting, and stringing of transmission towers as part of the HV/MV lines for the hydroelectric development of Jijji & Mulembwe, advancing sustainable energy infrastructure
Mobirise Website Builder

Drilling to assess the potential for iron ore extraction in Muko Kabale

TCA-MUKO-2024
Project

Services involved:
  • Tectoni Africa has concluded a 1000-meter drilling exploration in Muko, Kabale, to assess the potential for iron ore extraction. 

MAY 2030

Skyline Residence

This is masterpiece of modern living.

MAY 2030

Tranquil Estates

Collection of exclusive residential villas.

MAY 2030

Harmony Mall

It's unique blend of contemporary design.

MAY 2030

Innovate Tech Hub

It's a haven for creative collaboration.

MAY 2030

Historic Restoration

Breathes new life into a historic landmark.

  • 09812 765 432
  • mobi@rise.com

FabM5 Theme

© Copyright 2030 Mobirise - All Rights Reserved